Complete groundworks packages, self-delivered.
From site clearance and bulk dig to drainage, foundations and finished external works, delivered by our own crews with our own plant, aggregates and haulage behind them.
Vegetation, hardstanding and structures cleared and disposed of under licence.
Dig-and-cart, reduced level dig and cut-and-fill with our own fleet and haulage.
Foul and surface water systems, attenuation tanks and soakaways to spec.
Trench fill, strip and pad foundations set out and poured to engineer’s drawings.
Slabbing, kerbing, block paving and hard landscaping to finish the plot.
Sub-base, binder and surfacing for estate roads, accesses and parking areas.
Reinforced concrete slab, attenuation tank, drainage and surfacing for a new school building.
Working under Kier Construction on a live school site, we laid and poured the reinforced concrete slab inside the new steel frame, then installed the attenuation tank and ACO drainage run, set path edging kerbs to line and level, laid the sub-base and finished the car park and access in tarmac, all phased around term-time access.
Topsoil screened on site for the new football pitch at Langarth Garden Village.
Our 14 tonne excavator and dumpers fed a tracked screener on site, separating stone from topsoil so the material could be re-used on the pitch rather than carted away, saving haulage movements and disposal cost on one of Cornwall’s largest developments.
Deep excavation, crate soakaway, foundations and a carport retaining wall.
A steep coastal plot dug out for a new house: deep excavation, a crate soakaway wrapped in geotextile for surface water, strip foundations, a reinforced carport retaining wall and the finished slab, all worked around tight access off the main road.
Reinforced concrete base for a new highway crash barrier, formed and poured beside a live road.
Working beside a live carriageway, we broke out and excavated the existing verge, carting the arisings away as the dig progressed. Formwork and a steel reinforcement cage were set to line and level, then poured and finished ready for the barrier posts, with pedestrian access and traffic management maintained throughout.
Extension substructure on a creekside plot: footings, drainage, blockwork and slab.
Set out and excavated the footing trenches with a mini excavator, laser-levelled to depth, with spoil carted off site as the dig progressed. Footings poured, then the underground drainage run in and bedded, inspection chambers set, substructure blockwork built off the footings and the sub-base laid and compacted ready for the slab, all in a tight creekside garden with restricted access.
Full groundworks package for a new swimming pool, from the dig to the finished landscaping.
Excavation for the pool structure, underground drainage, then decking and landscaping to finish, delivered in partnership with Cornwall Pools Ltd so the pool build and the groundworks ran to one programme.
Because we own the fleet, employ the operators and supply the aggregate, there is no waiting on third parties and no gap in responsibility. One schedule, one point of contact, one invoice.
We walk the site, check access and agree the scope with you face to face.
A clear, itemised price with the schedule and any provisional sums spelled out.
Our own crew, plant and haulage arrive on the agreed date and work to schedule.
Site left clean, with as-built information and duty-of-care paperwork.
Constructionline Gold pre-qualification, SSIP-assessed health and safety, CHAS accreditation and ISO 9001 & 14001 certification, all audited independently each year. It is the paperwork main contractors and local authorities ask for before you set foot on site, and it is in place before we quote.
Directly employed teams working from Truro and Launceston across both counties, from Penzance to Exeter, on residential, commercial and local authority projects.